EE =& get_instance();?>

Repowering from 300kW to 2.300kW

Although The Wind Factory’s main focus is on wind turbines smaller than 1MW, incidentally we achieve repowering existing wind turbines into multi-MW turbines. After almost 12 years, a productive BONUS300 turbine on 40 meter tower has been dismantled and replaced by a new Enercon E70 2.3MW turbine on a 65m tower and 71m rotor. The wind turbine will produce around 4.000MWh annually.
After a thorough revision, the BONUS300 has been rebuilt in Northern Ireland, ready for another 15 years of energy production: the ultimate in durability!

Images