The Sun Factory installed a 2,3MW Solar Park in La Gineta, Spain. The installation has been engineered on three-dimensional solar trackers as land costs were relatively high. These trackers will provide around 20% more production using the same solar capacity, due to an active positioning system (hydraulic) towards the sun during daytime. First class Solar panels of Sharp and grid-inverters of Mastervolt were used to assure maximum availability, production and reliability. The solar plant has been build from start till commissioning within 6 months to be able to produce over 4.000 MWh a year.
System | grid-connected |
Capacity | 2,3 MWp |
Application | on frame at ground |
Year of construction | 2010 |
Client | Investment group |
Country / Region | Spain |