3,3 MWp Solar parc - Spain

The Sun Factory installed a 3,3 MW Solar Park in the South of Spain, where solar irradiation is on a high level. The installation has been engineered based on a fixed frame as land costs were relatively low. First class Solar panels of Sharp and grid-inverters of Mastervolt were used to assure maximum availability, production and reliability during the first 20 years. The solar plant has been build from start till commissioning within 6 months to be able to produce over 7.000 MWh a year.

System grid-connected
Capacity 3,3 MWp
Application on frame at ground
Year of construction 2009
Client Utility
Country / Region Spain