3 x 900 kW Direct Wind in Friesland, The Netherlands

Three farmers repowered each an 80 kW wind turbine into a 900 kW Direct Wind. Local regulations limited the hub height to 35 m, which required special tower size for the project. Dismantling of the 80 kW wind turbines and installation & maintenance of the new wind turbines are executed by The Wind Factory. The annual energy production is estimated at 2000 MWh per turbine.

System grid-connected
Capacity 3 x 900 kW
Construction 35m tube tower
Year of construction 2009
Client Agribusiness
Country / region Netherlands / Friesland