Three farmers repowered each an 80 kW wind turbine into a 900 kW Direct Wind. Local regulations limited the hub height to 35 m, which required special tower size for the project. Dismantling of the 80 kW wind turbines and installation & maintenance of the new wind turbines are executed by The Wind Factory. The annual energy production is estimated at 2000 MWh per turbine.
System | grid-connected |
Capacity | 3 x 900 kW |
Construction | 35m tube tower |
Year of construction | 2009 |
Client | Agribusiness |
Country / region | Netherlands / Friesland |